Reconsruction of Zarzaitine Gas Lift Compressor Station

Country:

Algeria

Client:

Sinopec/Sonatrac

Execution period:

2016 – 2017

Project Description:

  • Flow rate 4,3 mil. nm3/day
  • Configuration: 2 + 1 (2Х50%).
  • TC unit: Siemens/Dresser Rand. Compressor: Dresser Rand. Turbine: Siemens with cap. 25 MW each.

Scope of our service:

  • Survey, Basic Design for Process and Mechanical parts, Power Supply System, Plot Plan and Transport, Communication Systems, Control System (ICSS) and Instrumentation, HVAC, Water Supply, Sewerage Systems, Fire Extinguishing Systems;
  • Civil/Structure;
  • Fire & Gas Detection System;
  • Cathodic Protection System, HSE, Safety, QA/QC, Technical documents for procurement (Requisition, RFQ, TBE, RTA, review of vendors’ documents)
  • HAZID

Це загоМИ ПАРТНЕРИ КОМПАНІЇ «HEXAGON PPM»ловок